Story
Reusing façade components eliminates the carbon emissions associated with the manufacture of new materials. This is exemplified on the recent refurbishment of 1 Triton Squarae, London.
The team carefully dismantled and refurbished over 3,500m2 of façade panels. Cleaned, reinspected, reinstated The outer unit, including glass and framing, of the double-skin façade was dismantled, cleaned, inspected and reinstalled.
A key enabler for opportunity was the access to good record information from the original as-built 1990’s design and the use of predominately dry-fixed connections within the façade system, which avoided the challenges associated with disassembling adhesive connections.
To minimise emissions further a pop-up factory was setup in Essex to undertake the refurbishment and avoid excessive transportation.

The Team
Client: British Land
Contractor: Lendlease
Façade Contractor: Gartner
Façade Consultant: Arup
Completed 2021